1.Whilst all reasonable care will be taken during the execution of the works, no responsibility can be accepted for any faults or failures that may occur to existing pipework, fittings, equipment, etc. due to disturbance caused by the proposed works.
2.The attached estimate is based on a non-intrusive survey of the property and, as such, it is assumed that any existing systems that we connect to are in good condition and in working order. Should we find, during the course of the works, any faults with the existing systems we reserve the right to make a charge for correcting same. Should the client fail to mention any relevant facts relating to the existing installation we reserve the right to make a charge for correcting same.
3.Dismantling, clearing and re-instatement of any fitted cupboards, etc. to permit the proposed works to proceed will be charged at extra cost unless specified.
4.If, during the execution of the proposed works it is necessary to gain access into floors below fitted carpets, these will be lifted by us and laid back on completion. No re-stretching or fixing has been allowed for unless specified. For floors covered with thermoplastic tiles, vinyl sheet covering, cork tiles or laminate flooring, no allowance has been made for re- instatement unless specified.
5.Whilst all holes formed during the execution of the proposed works will be made good on completion, no allowance has been made for re-instatement of decorations. We do not guarantee to match existing brickwork where boiler flue terminals have been removed.
6.No allowance has been made for chasing in of pipework or painting/decorating of the new works.
7.It has been assumed that unrestricted access to all
relevant parts of the property will be afforded to us during the course of the works. Any delays caused by restricted access not notified at the time of survey may be subject to an extra charge and/or delay in completion.
8.Ownership of any materials supplied, whether fixed or unfixed, shall not pass to the Client until payment in full has been received for said materials. We reserve the right to take whatever legal action may be necessary to secure payment for the works carried out and materials supplied either fixed or unfixed.
9.The works described in the estimate will be guaranteed for a period of twelve months from date of completion against faulty design and workmanship. The materials supplied will be subject to the
suppliers/manufacturers guarantees. The Client’s Statutory Right in law are not effected by this guarantee. This guarantee does not extend to existing, installed equipment, pipework or fittings.
10.Whilst certain items may be specified by name or model, we reserve the option to supply goods of a different manufacture providing they shall be suitable for the purpose intended.
11.Any additional works that the Client requires to be carried out whilst the specified works are being executed will be charged at extra cost. An indication of such cost will be given and the Client’s agreement to same will be obtained before the additional works proceed.
12.Payment for works completes is required strictly upon completion and it is a condition of acceptance that this is adhered to.
13.The price specified in this estimate does not include for the removal of any dangerous waste materials such as asbestos found when carrying out the works. This will be subject to an extra charge.
14.Should the works include a pressurising an existing heating system, the Client should be aware that the higher pressures used by this type of boiler may find weaknesses in the existing system. Any repairs required in this respect are not included in this estimate.
15.Prior to commencement of work involving gas appliances, the existing gas supply will be subject to a soundness test to check for compliance with Gas Safety Regulations. Any faults found will be advised to the Client and any rectification works required may be subject to additional charges.
16.Should the works include a powerflush of the existing heating system, it must be pointed out that, whilst this treatment is generally harmless, depending on the condition of the existing components the process may find weaknesses in the system. Should any such problems be encountered then any rectification works required may be charged at extra cost.
17.As Of 6th April 2018 Boiler Plus will come into effect. On any new Combi boiler installation either a Smart learning thermostat, weather compensation/Load compensation or flue recovery system has to be installed in line with building control regulations. It is the home owners responsibility to ensure new Combi boilers are installed per new regulations or could be liable for a £5000 fine from the local council.
18.Failure to pay within the payment terms with automatically incur a charge of £50 with the debt being passed to a debt collection agency and any further debt collection fees will be passed to the bill payer.
19.Acceptance of the Estimate confirms acceptance of these conditions.